top of page
![]() | ![]() |
---|---|
![]() | ![]() |
BEACON GROUP OFFICE
This 34,000 square foot addition more than doubles the Beacon Foundation’s existing space, and consolidates their operations into a single locations. The ground floor features a light manufacturing facility and the second floor has office space and training rooms. A portion of the existing facility was also renovated.
ADDITIONAL PROJECTS
​
Krebs Engineers Office
Krebs Engineers Canopy & Enclosure
Krebs Engineers APC T.I.
FLSmidth Krebs Super Center
FLSmidth Krebs Paint Booth - Bldg. E
Cox MTC Tucson Expansion
Switch & Data Facilities
International Towers
Aircraft Inspection & Management
Johns Manville ADA Upgrades
Alcoa T.I.
Garmin Call Center
Trane T.I.
TA Caid Automation Building
Aerovation Inc.
Atlas Copco 3 Phase Expansion
Campbell Technologies PEMB
Reywest
Containers Southwest
Sonoran Industrial
Krebs Engineers
Maddok Machinery
Nevada Railroad Materials Facility
Sion Power
Copper Pointe Business Plaza
City of Tucson Heavy Equipment Shop
State Industrial Supply
bottom of page